Lead-time accuracy beats lead-time speed. A supplier promising 15 days with ±2 days variance is worth more than one promising 10 days with ±10 days variance, because your production plan is built on the certainty, not the average. Most scorecards weight lead time as “shorter is better.” That is wrong, and it is the single most common scoring error in procurement templates.
Below is the 23-check card, weighted, with the scoring rules that make it useful.
Pass threshold: 70 / 100. Below 60, do not sample. 60–70, sample and re-audit.OEM/ODM service specifications
A note on check 7: verify independently. Both TÜV and Intertek maintain online certificate databases. A PDF is trivially edited; the database is not.
Supplier A is cheapest and fails outright: no documented burn-in, unverifiable certificate. That is the normal shape of the result — the bottom-quote supplier usually scores lowest.
Supplier C scores highest and costs 46% more than A. Is it worth it? On a 5,000-unit order that is $42,000**. One percentage point of field failure on 5,000 units is 50 RMAs; at $180 labour plus 60 freight each, that is **12,000 — plus the account damage, which is the part nobody puts in the spreadsheet.
60 freight each, that is **
The correlation between price and score is strongest in the middle of the range. The most expensive supplier is often selling brand premium rather than quality; the cheapest is almost always selling a shortened process. Score the 2nd to 4th cheapest and pick from there.
Score us. Send the 23 checks and we will fill them in and return the sheet — including the burn-in log and the capacitor brand. → Request our completed scorecard · Get a quote
As a trusted LED power supply manufacturer, INERPOWER delivers rigid engineering quality and custom OEM/ODM solutions to worldwide B2B clients.
Two 200 W drivers wired in parallel do not give you 400 W of usable capacity. In the worst case you get barely more than one unit can deliver, and wha…
There is no such thing as a “CE certificate” issued by an authority. CE is a self-declaration by the manufacturer that the product meets t…
Replacing “like for like” on nameplate watts and volts is the single most common reason a replacement fails in the same way, in the same p…
“Class 2” and “Class II” are not the same thing written two ways. One is a North American output power limit defined in UL 131…
Dimming to 50% does not cut your power bill by 50%. LED efficacy rises as drive current falls, so halving the light typically leaves you at roughly 60…
The unit price of a signage power supply is the number everyone negotiates and the number that matters least. On an outdoor installation with a five-y…