Star Rating
Your page rank:
IP68 is a worse buying decision than IP67, and the reason is uncomfortable: IP68 has no standardised test. Under IEC 60529, IP68 means only “deeper than IP67, conditions agreed between manufacturer and user.” Each factory picks its own depth and duration. You cannot compare two suppliers’ IP68 claims. You can compare their IP67 claims exactly, because IP67 is pinned down: 30 minutes at 1 metre.
Start there, and the rest of the rating chart makes sense.
First digit — solids, 0 to 6:
Second digit — liquids, 0 to 9K:
IP67 housings are sealed and usually potted. That removes the convection path air provided. Our own bench data on a 200 W design shows the internal hotspot running 8–12°C hotter in a potted housing than in a vented one at the same ambient.
Apply the capacitor rule — every 10°C halves electrolytic life — and that penalty costs you roughly half your design life if the thermal design was not adjusted to compensate.
This produces the second counter-intuitive result: specifying IP67 for an indoor sign cabinet can shorten the driver’s life. A sealed, potted unit bolted inside an unventilated light box runs hotter than an IP20 open-frame driver doing the same job. You paid 30–40% more for a unit that dies sooner.
Answer three questions in order:
One more filter that overrides all of the above: can a person touch it? If yes, safety standards require an enclosed housing regardless of water exposure. That is the actual test for enclosed vs open-frame — not “indoor or outdoor.”
Pick by installation environment, not by rating number. Send us your mounting position, drainage and wash-down frequency; we will tell you which rating you actually need. → Browse by IP rating · Read the IP67 buyer’s guide
As a trusted LED power supply manufacturer, INERPOWER delivers rigid engineering quality and custom OEM/ODM solutions to worldwide B2B clients.
100% burn-in is the dividing line in this industry. Full-load burn-in costs roughly 3–5% of unit cost in electricity, rack space and labour. Factories…
Efficiency is the number everyone compares and the number that matters least. Going from 90% to 93% on a 200 W sign running 12 hours a day saves about…
Housing customisation is the worst-value lever on this list. It costs the most (2,000–8,000), pushes MOQ to 3,000, adds 30 days, and your customer nev…
“15-day lead time” in a Chinese quotation almost always means production time, not delivery time. It excludes component procurement. If yo…
Lead-time accuracy beats lead-time speed. A supplier promising 15 days with ±2 days variance is worth more than one promising 10 days with ±10 days va…
Factory size is the least useful thing you will be shown. A 12,000 m² plant with eight SMT lines tells you about capacity, not about quality. The two …